Analisa Manajemen Waktu Pada Pengelolaan Administrasi Di Dinas Perhubungan Provinsi Sumatera Utara Dengan Critical Path Method (CPM)

Authors

  • Eva Ridya Wanti Lingga Universitas Islam Negeri Sumatera Utara Medan
  • Atika Nadila Universitas Islam Negeri Sumatera Utara Medan
  • Muhammad Farhan Mingka Universitas Islam Negeri Sumatera Utara Medan
  • Riezky Meiliza Universitas Islam Negeri Sumatera Utara Medan
  • Ismail Husein Universitas Islam Negeri Sumatera Utara Medan

DOI:

https://doi.org/10.70340/japamas.v1i2.30

Keywords:

Practical Work (KP), administration, Critical Path Methode (CPM)

Abstract

Practical  work  (KP)  is  an  academic  activity  that  aims  to  shape  student  learning  and  develop  and  improve  a  qualified  workforce.  By  participating  in  practical  work  (KP)  it  is  hoped  that  istudents  will  be  able  to  add  knowledge,  skills  and  experience  in  preparing  themselves  to  enter  the  real  world  of  work.  The  problems  that  occur  in  the  administration  section  are  delays  in  the  administrative  process.  Therefore,  practitioners  try  to  use  the  Critical  Path  Method  to  complete  administrative  processes  to  make  them  more  efficient  by  determining  the  critical  path  to  inefficient  work  processes.  the  critical  path  can  be  found  by  looking  at  the  total  float  resulting  in  a  sum  equal  to  0  which  is  a  critical  activity  and  the  critical  path  is  found  as  follows:  "1-3-4".

Downloads

Download data is not yet available.

References

A, Anggara H, “Perencanaan Dan Pengendalian Proyek Dengan Metode Pert-Cpm: Studi Kasus Fly Over Ahmad Yani”, Journal The Winners, Vol. 6, No. 2, pp 155-174, Sep. 2005.

Asri, D. F., Setiawan, T. H., And iRusdiana, Y. “Analisis Jaringan Kerja Pada Evaluasi Penjadwalan Waktu Dan Biaya Penyelesaian Proyek Dengan Menggunakan Metode Pert & Cpm”, Jurnal Saintika Unpam, Vol. 2, No. 2, pp 136-148, Jan. 2020.

Ratminto Dan Winarsih, “Manajemen Pelayanan”, Pustaka Pelajar, Yogyakarta, 2005.

Risnawati, “Optimalisasi Pelaksanaan Proyek Dengan Metode Evaluasi Dan Review Proyek (Pert) Dan Critical Path Method (CPM)”, Jurnal MSA, Vol. 3, No. 2, pp 57-58, 2014.

Sugiono. “Metode Penelitian Kuantitatif, Kualitatif dan R&D”, Alfabeta, Bandung, 2012.

Wardani, N. M., Musdalifah, S., & Lusiyanti, D, “Optimalisasi Biaya Dan Waktu Pelaksanaan Proyek Pembangunan Perumahan Citraland Palu Menggunakan Metode Program Evaluation And Review Technique (Pert) – Critical Path Method (Cpm)”, Jurnal iIlmiah Matematika Dan Terapan, Vol. 15, No. 2, pp 205-207, 2018.